About Maxx Arabia

Maxx Arabia Projects Solutions has assembled one of the most experienced teams in the industry equipped them with the most technologically advanced management systems for all projects logistics operations and management, which we strategically administer via our network of worldwide offices.

We have successfully operated and still operates in various construction sectors: Petrochemical, Power Generation, Oil Refineries, Industrial Machinery and Civil projects etc. In each sector, our dedicated team that has accumulated experience in its specific field and manage entire onshore management services which includes import/ export customs clearance process at seaport (s)/ airport (s) ...

Read More

News

Signed Contract agreement with Sinopac International, China

Maxx Arabia Projects Solutions signed contact agreement with china based leading EPC contractor “Sinopac International” herein in Saudi Arabia for handling their bulk volume construction equipment consignments for SWCC project, Yanbu. All consignment to be arrived at Jeddah Islamic seaport on permanent basis which includes MVPI and local equipment registration process also be handled by our team in Jeddah. Sinopac International have awarded contract in Yanbu for SWCC project.

Pipes handling and installation contract in Yanbu

Maxx Arabia successfully executing land transportation of various type of Pipes from Jubail to Yanbu in different unloading locations by using special type of long 28 meter pipe dolly trailers including unloading arrangements of pipes from trailers to final positioning at jobsite by using different type of long boom cranes. It is a challenging project execution, our team successfully managed all scope activities in time and safely.

Maxx Arabia handling ODC and Heavy Consignments for Ras Al Khair project

Maxx Arabia successfully handled and still handling massive volume of various projects consignments for Ras Al Khair project with challenging volume approx 25,000 F/T in one vessel. Our operation team in Jubail have achieved all benchmark related to clearance process and deliveries set by client in timely and professionally for which we have been appreciated by IPL for tireless efforts of our operation team.

Successful Operation for Installation of Generators/ Gas Turbines onto foundation

Maxx Arabia’s engineering/ operation teams proven extraordinary performance for project awarded to arrange shifting and installation of Generators (260 MT) and Gas Turbines (180 MT) onto foundation at Ras Al Khair project site. We utilized special designed “Gantry Systems” with lifting capacity of 600 Tons certified by TUV-Germany. Lifting job executed with full satisfaction of SIEMENS technical team abiding all safety and security as per international standards.

Contract Awarded for Rabigh Power Plant in Rabigh

Maxx Arabia achieved another success after successful execution of approx. 150,000 F/T various (General/ ODC and Heavy) project shipments for Rabigh Power Plant Project in Rabigh includes all process arranging permits for DG consignments and duty refund process. Seepco III expressed sincere appreciation for successful execution of entire project activities intime as per client requirements.

Successful Execution for Qurayyah Project

Samsung C&T Korean based EPC contractor under execution for construction of power plant project in Qurayyah which is located approx. 120 KM from Dammam. Maxx Arabia Projects Solutions moving various project equipment including local haulage of “MODULES” from Dammam and Jubail seaport to jobsite by using hydraulic conventional modular.

Delivered LP Flash Column for Al-Bayroni Amonia Energy Optima Project (ABEOP), Jubail

Another success recorded by our operation and engineering team while handling LP Flash Column unit for Al bayroni Amonia Optima Project (SABIC) arrived at Jubail Commercial seaport. This contract is being executed under TOYO ENGINEERING as EPC of this project.